This project is invested by Vision Group and jointly constructed by Sifang Electric and other wind power prefabrication projects, including primary equipment, secondary equipment, battery room, tool room, living quarters and other supporting facilities. The whole prefabrication cabin adopts factory modular prefabrication and builds building blocks on site.
Huiji undertakes the system integration of prefabrication, decoration, temperature control and monitoring of the precast module in the factory of the whole project, and synchronizes the on-site engineering construction.
Since 17 years, Huiji has successively provided Huaiyin Wind Power Project, Sheyang Wind Power Project Phase 1-3, Henan Xiangzhuang Project, Henan Liutang Project, Hebei Guantao Project, Heilongjiang Hegang Project, Heilongjiang Longjiang Project and dozens of other wind power plant projects for Vision Group. At present, Huiji has become the core strategic precast module supplier for Vision Group and Sifang Group.